Islamabad (Anantnag), Dec 27: The Northern Railways Thursday announced that Baramulla would be connected with Banihal by train in April next.
“Banihal-Qazigund railway tunnel which is the largest in India is complete and by April next the train will chug from Banihal to Baramulla,” Northern Railway Board Member, AP Mishra told media persons on the sidelines of the train trial run on Qazigund-Banihal stretch.
He said besides train on Udhampur-Katra stretch will also be able to ply by April 2013 as the work is nearing completion.
“The valley will be fully connected to the rest of the country by 2017 as the work on Udhampur-Banihal stretch is going on in full gear,” Mishra added.
The highlight of the Qazigund-Banihal link is the 11.21 km tunnel – the longest railway tunnel in India, which has reduced the distance between the two towns by 50 per cent.
The tunnel is 8.40 metres wide with a height of 7.39 metres. There is a provision of a three-metre wide road along the length of the tunnel for the purpose of maintenance and emergency relief.
Rat Infestation Plagues GMC Anantnag: Hygiene Standards Hit Rock Bottom
Rats are everywhere—under the beds, inside the central heating system, and even on trolleys Anantnag, Dec 30: Government…
Read More →
J&K Policeman injured after unknown gunmen shot at him in Anantnag
Terrorists shot at and injured a policeman in Anantnag district of Jammu and Kashmir on Sunday, officials said.…
Read More →
Emergency landing and runway strip coming up along the NH-44 in Anantnag
As the standoff continues between the Indian and Chinese armies along the Line of Actual Control (LAC) in…
Read More →